Our Project for Summer 2006 - 2007   - Remodel Plan -

  Tear out and Construction - Phase 1

Entry and Porch
1. Tear Out Entry Door
2. Install New Entry Door
3. Tear Out Porch
4. Build Porch
5. Build Rail
6. Tile Entry / Porch
7. Cedar Shake Gable

Master Bedroom
1. Tear Out Closet
2. Tear Out Ceiling
3. Sheetrock
4. Remove and Install Carpet
5. Build Closet, Install Closet Doors
6. Install New Outlets, Switch, covers, light fixture
7. Remove Door, Install New Door
8. Paint
9. Install Heater / Furnace
10. Install Molding

East Bedroom
1. Sheetrock Ceiling, Closet, Walls
2. Paint
3. Tear Out Door, Built-in Drawers
4. Move Doorway 2’ North, Install Door
5. Install New Outlets, Switch, covers, light fixture, Smoke Alarm
6. Install Heater / Furnace
7. Install Molding

West Bedroom
1. Sheetrock Ceiling, Closet, Walls
2. Paint
3. Tear Out Door, Built-in Drawers
4. Move Doorway 2’ North, Install Door
5. Build New Closet 6. Install New Outlets, Switch, covers, light fixture, Smoke Alarm
7. Install Heater / Furnace
8. Install Molding

Living Room
1. Sheetrock Ceiling, Walls
2. Paint
3. Install New Outlets, Switch, covers, light fixtures, Smoke Alarm
4. Install Heater / Furnace
5. Install Molding

Kitchen
1. Tear Out Appliances
2. Tear out Floor
3. Wall In Doorway to bedroom
4. Paint
5. Repair Drawers
6. Remove Countertops
7. Clean Shelves
8. Clean Wood
9. Install New Countertops
10. Install New floor
11. Install Handles
12. Purchase and Install New Stove, Sink, Faucet, Dishwasher, Hot Water, Disposal
13. Install New Outlets, Switches, covers, light fixtures
14. Shorten, Rebuild Pantry, New Header
15. Install Heater / Furnace

Overall Work
1. Install Foundation, Footing, Block, Frame, Sheeting
2. Rebuild Deck
3. Rock Driveway
4. Landscape Front Yard
5. Pressure Wash House, Sidewalks, and Brick
6. Clean weeds out of Lawn
7. Clean Up Back Yard
8. Furnace if not heaters


  Tear out and Construction - Phase 2

Bathroom
1. Remove Door & North Wall
2. Install New Door 2’ Further North
3. Tear Out Toilet, Sink, Cabinet
4. Redo Plumbing 5. Redo Floor 6. Install New Shower / Tub Combo 7. Sheetrock 8. Paint 9. Install new Toilet, cabinet and Sink
10. Install New Outlets, Switches, covers, light fixture
11. Replace Window
12. Move Fan

Bathroom
1. Remove Door & North Wall
2. Install New Door 2’ Further North
3. Tear Out Toilet, Sink, Cabinet
4. Redo Plumbing 5. Redo Floor 6. Install New Shower / Tub Combo 7. Sheetrock 8. Paint 9. Install new Toilet, cabinet and Sink
10. Install New Outlets, Switches, covers, light fixture
11. Replace Window
12. Move Fan

Overall Work
1. Install Furnace / Heat Pump
2. Build North Addition
3. Expand LR to Porch and Wall In
4. R&R Windows
5. Paint or Redo Siding and Paint
6. Redo Gables
7. Landscape Back Yard
8. Complete Basement - New Entry, Staircase, Bath, Laundry, 2 Bedrooms, Bonus Room
9. Addition - Master Walk-in Closet, Bathroom, Living Room


Email: Justin