Browny
Kitchen
- Remove Cabinets
- Remove Dishwasher
- Open Doorway Into Utility - 60" w/ square corners
- Open Doorway into living room, Bull-nose Wrap
- Remove Wall Between Kitchen and Dining Room - Bull-nose wrap header
- Wire Kitchen for Microwave Circuit, Disposal, Insta-hot, Relocate Dishwasher
- Wire Two refers, hood, Second Outlet Circuit, Relocate range,
- Add lighting over bar - recessed lights, Relocate Center Fixture
- Tear Out First Layer of flooring & Repair Floor
- Raise East Wall Foundation 1.5"
- Lower High Ridge - 1"
- Remove Wainscoting
- Prep Walls / Remove Wallpaper
- Texture & Paint
- R&R Window
- Replace Outlets and switches
- Replace Light Fixtures,
- Repair Sheet-rock
- Trim Floor, Windows and unwrapped Doorways,
- Install New Hood
- Install Lower Cabinets, Upper Cabinets
- Tile Floors After Cabinets in
- Install Countertops, Trim Countertops
- Install Appliances
Dining
- Replace Windows – OR Doors to Deck??
- Refinish Floor
- Repair, Sheet-rock, Tape, Texture New/Repaired Areas
- Replace Outlets, Relocate switch
- Demo Electric Heat
- Replace Light Fixture
- Trim Floor
- Paint
Utility / Mud-room
- Widen Doorway (see: kitchen)
- Tear Up First layer of Flooring??
- Linoleum - Wait until West Wall Removal decided
- R&R East Window (North may go away)
- Open Wall between Bathroom
- Plumb For Laundry Machines
- Paint, Trim Windows and Doorways
- Replace Outlets and switches
- Replace Light Fixture, Add Light Over Laundry Machines
Living Room
- Install 4 recessed lights, 2 more in LR hall
- Install LR Light switch
- Demo Wall Heater
- Remove Carpet
- Leave Window & Trim For Now
- Shorten Pony wall, remove post & upper frame
- Repair Sheet-rock, Tape & Texture Walls
- Paint Ceiling, Walls
- Install Pad & Carpet
- Replace Outlets and switches
West Bedroom
- Remove Carpet
- Replace Window
- R&R Door
- Remove Trim
- Replace Outlets and switches, Replace Light Fixture
- Install new Fixture in Closet
- Trim Windows, Door, Floor
- Paint Ceiling, Walls
- Carpet
Center Bedroom
- Remove Carpet
- Replace Window
- R&R Door
- Remove Trim
- Replace Outlets and switches, Replace Light Fixtures
- Remove Closet
- Frame and Sheet-rock Opening
- Trim Window, Door, Floor
- Repair Sheet-rock, Tape & Texture
- Paint Ceiling, Walls
- Carpet
Study / Office
- Remove Carpet
- Narrow Up Window to 36” Wide, Inside Looking Out - Right Side Jam Stays
- Remove Door
- Demo Electric Heat
- Remove Drawers
- Remove Closet
- Remove Trim
- Cut Open Wall & Install French Doors
- Install Pergo Flooring
- Trim Window, Doors & Floor
- Paint Ceiling, Walls
- Install Switch & Light, Replace Outlets
Master Bedroom
- R&R Windows
- Remove Closets
- Demo Electric Heat
- Relocate Door – 36” Wide (38” RO)
- Install Door Into New Closet
- Install Door Into Bathroom
- Relocate Hallway Light Switch
- Relocate light Switch (New Remote Switch), old Switch becomes Outlet
- Frame In Old Doorway
- Replace Outlets and switches, Replace Light Fixture
- Repair, Sheet-rock, Tape, Texture New/Repaired Areas
- Trim Windows, Door, Floor
- Remove Carpet
- Paint Ceiling, Walls
- Patch Floor
- Lay Pergo
Master Bathroom
- Remove Closet Wall Between Vanity and Master Wall Enlarging Vanity Area
- Relocate Switches
- Demo Electric Heat
- Wire For 2 Outlets On Vanity Wall
- Sheet-rock & Insulate Exposed Walls
- Tear Out Vanity & Tub
- Backer Board floor, Tile Floor, Grout
- Narrow Shower Wall 4”, Open Up Wall
- Install New Tub, Re-plumb valve & drain
- Glass Block Wall, Tile Surround , Grout All
- Save Toilet
- Replace Window
- Trim Window and Door
- Wall Utility Door
- Repair, Sheet-rock, Tape, Texture New/Repaired Areas
- Paint Walls
- Install New Vanity
- Install New Counter, Sinks, Faucets
- Replace Outlets and switches, Replace Light Fixtures
Master Closet
- Tear Out Old North Closet Wall, Shelves, Save Doors
- Wall Across Utility for East Wall In Closet
- Install Light & Switch (Relocate Power in attic from old closet)
- Repair, Sheet-rock, Tape, Texture New/Repaired Areas
- Trim, Paint, Paint Trim
- Install Bars, Shelves, Racks
- Lay Pergo
Laundry Room - Bathroom Conversion
- Frame Wall 14in. out for 32in. door
- Hang Door
- Repair, Sheet-rock, Tape, Texture New/Repaired Areas
- Relocate Light From Master Closet area
- Replace Outlets and switches, Replace Light Fixtures
- Remove Interior Wall & Door
- Replace Hot Water Tank
- Build Cedar Cabinet Around Hot Water Tank
- Add Toilet, Tub/Shower, Vanity Plumbing
- Install Toilet, Vanity, Shower/Tub
- Wire In Fan, Vanity Lights, Outlets
- Linoleum Floor
- Paint, Trim
Entry
- Remove Slate
- Tile Entry
- Pergo Hallway
- Repair, Sheet-rock, Tape, Texture New/Repaired Areas
- R&R Switches, Outlets, & Fixtures
- Remove Living Room Closet
- Widen & Raise Living Room Entry Way
- Wrap Opening - Bull-nose corners
- Paint, Trim
Main Bathroom - Laundry / Powder Conversion
- Remove Vanity
- Remove Hallway Door
- Remove Door
- Wall For Kitchen Pantry
- Cut In New Door To Hallway
- Demo Tub
- Wall and Door For Powder Bath
- Plumb for New Vanity Location
- Install New Vanity
- Wiring Changes For Vanity, Light, & Switch
- Paint, Trim
Whole House
- Replace All Doors
- Paint All Doors
- Paint All Trim
- Replace Outlets, switches, Light Fixtures
- Install New Base Molding & Trim
- New Roof
- New Siding
- Improve Or Remove Carport??
- Improve Foundation Posts and Beams, Some New Pads
- Repair Sheet-rock Damage
- Tape & Texture All New / Repaired Sheet-rock
- Unwire Unused Electric Heat Circuits
- Add Lights in Attic
- Add Lights and Outlets in Crawlspace
- Remove Remaining Electric Heat and Install Heat Pump & Forced Air System
- Replace All Gutters
Barn
- Tear Off Roof
- Level Upper & Lower Trusses, Roof Sags 3in. In Middle
- Sheet For Roofing
- Roof
- Cut Eaves, Hang new Fascia
- Install Gutters
Phase 2
- Pull Pump and Stand Pipe, replace with new
- Disconnect City Water for use below
- Build Loft in Barn Into Use-able Space