Morales Family Addition"
Click On The Picture Below To View A Larger Image:


The 750 square foot deck has been recycled and excavation is under way.
Our total dig-out was about 4 times the volume that had been expected


A big surprise to everyone was the fill layer we had to dig through
and the 3 foot cedar stump - still intact.


Forms are built and the pump truck is on site for the second time...


Finally ready to start building...
Footing Drains, Rain Drains, Backfill and compaction, Slope landscaped.


Roughed in some landscaping...